Factory Video Center

Verified Manufacturing & Live Testing Videos

Watch verified manufacturing tours, automated SMT cleanroom operations, 800W microinverter burn-in testing, and 5-minute balcony solar plug-and-play installation videos from Xiamen Sossen Energy Co., Ltd.

Manufacturing & QC

800W Dual MPPT Microinverter Automated Assembly

Full walkthrough of Fuji high-speed SMT placement, nitrogen reflow ovens, automated optical inspection (AOI), and 50Β°C thermal stress testing.

Installation Guide

5-Minute Balcony Solar Plug & Play Installation

Demonstration of AL6005-T5 aluminum bracket mounting on apartment railings, MC4 connection to the 800W microinverter, and Schuko wall plug-in.

Storage Bench Test

2.24kWh LiFePO4 Storage Hub Live Cycling Test

Real-time bench test demonstrating Shelly 3EM dynamic power throttling, zero-export grid compliance, and battery charge/discharge curve validation.

Facility Inspection

Xiamen Sossen Energy Factory & Cleanroom Facility

Facility tour of our 15,000 mΒ² manufacturing plant in Xiamen, helium mass spectrometer leak check station, and finished goods container loading dock.

Verified Quality Control & Manufacturing Evidence

Xiamen Sossen Energy Co., Ltd. (sossenpv.com) provides complete video evidence verifying our automated manufacturing standards, full-load burn-in chambers, and laboratory testing procedures for European B2B procurement partners. Across our 15,000 square meter ISO 9001 certified facility, high-speed Fuji SMT lines place microinverter surface-mount devices with 15-micron precision, followed by nitrogen-purged wave soldering to guarantee solder joint integrity under cyclic thermal expansion. Finished 800W microinverter units undergo automated 100% full-load electrical burn-in at 50Β°C ambient room temperature, 6000V lightning surge withstand pulses, and helium mass spectrometer sealing inspections to certify IP67 water immersion resistance before packaging. Our video documentation also verifies real-time Shelly 3EM dynamic zero-grid-export throttling response times within 500ms and 5-minute Schuko plug-and-play mechanical installation on German apartment railings compliant with Eurocode EN 1991-1-4 structural safety mandates.

Video Test Inspection Test Condition / Standard Engineering Threshold Verified Result Equipment Model
Thermal Full-Load Burn-In 50 Β°C Ambient Chamber, 4 Hours Pout >= 800 W Continuous Pass (96.7% Efficiency) Chroma 63800 Electronic Load
Lightning Surge Withstand EN 61000-4-5 (1.2/50 ΞΌs pulse) 6,000 V Common / Differential Pass (0 Breakdown) EM TEST UCS 500N Surge Gen
Helium Seal Leak Inspection ASTM E499 Mass Spectrometer Leak Rate < 1x10^-6 mbarΒ·l/s Pass (IP67 Immersion Safe) Pfeiffer Vacuum ASM 340
Dynamic Zero-Export Latency Shelly 3EM Wi-Fi / Modbus RTU Response Time < 500 ms Pass (380 ms Average) Yokogawa WT3000E Analyzer
WhatsApp Online